The following roadworks are scheduled:
- Sandbach Road, Newbold Asbury on 25 September 2019 using two way signals to reset fallen sign
- Dodds Lane, Newbold Asbury on 1 October 2019 using multiphase signals to install a new post and attach sign
The following roadworks are scheduled: